You're the part-time network tech at Camas Ridge Campus. The riser between
Birchwood Library (IDF) and Foster Science Hall (MDF) was just pulled:
a pre-terminated OM4 multimode pair already lands on the fiber panels (LIUs) in
both rooms, with the polarity crossover built into the riser. Your job is to seat the
right transceivers, patch each switch to its panel, put the distribution switch on
protected power, and verify the cross-building link comes up.
Formative lab: the checklist and answer key are visible in your browser, so the
score is self-reported. Your instructor's copy can re-score on the server. Your
callsign is a pseudonym; this lab never asks for your real name, email, or ID.