Two stops on the work order. Seat and cable a network adapter at the Prototyping Bay bench, confirm the link, then validate that the Comms Room battery backups carry the load when utility power drops. Work the steps in a safe, real-world order — the console will flag mistakes the way the gear would.
Leave the feeds unplugged when you finish — that's the held state for this check.